The project was completed in conjunction with Michigan Department of Transportation as a Local Agency Project. It included the design and construction services for the reconstruction and widening of 5,200 LF of road. It also required stormwater analysis and design for the existing and proposed watersheds tributary to the existing stormwater basin, and new storm sewer design. Installment of a new sanitary sewer and relocation of existing overhead utilities to under ground was also provided.


Topographical Survey
Site Engineering
Storm sewer piping design
Construction Staking
Construction Inspection
Construction Testing