Paradigm Design has assisted 2nd Congregational Church with several maintenance and construction projects. The most recent maintenance project was the design and resolution of a perimeter storm drainage system.
The most recent construction project was the enlargement of the side organ chambers and the construction of new rear chambers for a new pipe organ. The project required that the colonial style of the church be retained with the construction and renovation. |