Project Name: Stewart Ave. & 44th St. Watermain Imp.
|
| Owner: City of Fremont, Michigan |
| Contact: Chris Yonker, City Manager |
| Date Completed: 2006 |
| Construction Cost: $156,000.00
|
 |
The project, locally funded, included the design and bidding for 2,200 feet of watermain replacement. It also included spot replacement of curb & gutter and street reconstruction.
Hydrants were replaced as well as water services within the right-of-way.
|
 |
| Paradigm Design provided surveying, watermain design & permitting, construction cost estimates and construction drawings.
|
 |
| Paradigm Design provided the Owner with bid phase services including attendance at the bid opening, bid tab preparation and recommendation of award.
|