|
|
 |
 |
64,880 square foot injection mold manufacturing plant with
a 12,140 square foot, 2-story office |
 |
Sub-floor material and process utility tunnels |
 |
Pre-engineered structure with glass and masonry
infill at offices |
 |
Overhead crane system integrated into the pre-engineered
structure |
|