|
|
|
Altering the store's prototype design so that it met the zoning requirements of the City - a limitation on signage was the major issue |
|
 |
Working with prototype drawings that were constantly changing and evolving -these changes required coordination with the current projects |
|
These challenges were overcome with compromises on signage amounts and sizes. A thorough review of the prototype drawings was performed to ensure accurate construction documents. Several design elements from this particular store were used on future prototype drawings. |
|